A look back in time

The history of the cable cars of Kappl

50 years of excellence
divider divider
Since 1970

The history of the cable car company

Traditional cable car operator

The cable cars of Kappl can look back on an impressive history. Since the company’s founding back in 1970, one single ski lift has grown into an entire ski resort which now is one of the winter sports highlights of the Paznaun valley.

divider divider
Early days

The origins of Kappl’s cable cars

How it all began …

7 May 1970 marked the birth of “Kappl-Dias-Schiliftgesellschaft”. 71 parties showed up for the founding assembly of the ambitious winter sports company, among them representatives from the local authorities and tourist association as well as 60 private shareholders.

Josef Wechner and Jakob Rudigier were named Managing Directors. The company’s share capital was 3,349,000 Austrian Schilling, or 243,400 Euros.

divider divider
Development

The cable cars of today

Expansion and growth

Following the successful start of Dias chairlift, Kappl’s winter sports scene kept on thriving. Today, around 50 years after its foundation, the ski resort boasts ten cable cars, lifts and conveyor belts . This development is proof of our continuous efforts to turn our vision into reality: providing guests with top-class skiing and hiking experiences in the mountains of the Paznaun valley.

divider divider
Snow pioneers

first cable cars in Kappl

1970 to 1980

After the building permit was issued by the provincial government on 2 July 1970, the ambitious construction project was gradually turned into reality.

Year

Milestone(s)

1970

Construction and first operation of Dias chairlift and Mardinalift

Purchase of snow-grooming machines

1971

Construction and first operation of Hirschenbadlift and Schönebelelift

1972–1975

Slope expansion works and purchase of new snow-grooming machines

1978/79

First operation of Alblitt chairlift and Alblitt drag lift

1979/80

Expansion of Alblitt drag lift up to 2,690 m Alblittkopf

divider divider
To the top

1979 & 1980: Successful years for the cable cars of Kappl

Did you know …

… that the 1979/80 season was the first time that one million winter sports enthusiasts were transported by Wintersport Kappl GmbH & Co KG, as it was called back then?

divider divider
Cable car evolution

Other milestones in the history of the cable cars of Kappl

From 1986 to today

Year

Milestone(s)

1986

Replacement of Dias chairlift with a 4-seater monocable gondola lift

1987

Construction of Gongall two-seater chairlift (for 26 million Schilling, or 1,880,000 Euros)

1989/1990

 

First use of snow cannons before the snow-making system was continuously expanded and improved

1997/1998

Introduction of the ski area season tickets  4+2

1998/1999

Construction of the 4-seater Alblitt chairlift

1999/2000

Various slope improvements

2000/2001

New design for the building of the valley station; slope improvements on the valley run

2001/2002

Construction of the 4-seater Alblittkopf chairlift; construction of the pedestrian underpass at the valley run

2002/2003

Implementation of a snow-making system at the valley run

2003/2004

Construction of Sunny Mountain Adventure Park , the snow-making system and the floodlit natural toboggan run

2004/2005

2004/2005    Expansion of “Sunny Mountain” restaurant with a self-service restaurant (“Almstüberl ”) and “Panoramabar ”

2005/2006

2005/2006    Opening of slope No. 10 “Almstüberlabfahrt”

2007

First operation of  Alblittbahn cable car during summer and implementation of the Sunny Mountain Card

2007/2008

Expansion of the snow-making system at Alblittkopf (2,690 m); construction of the pressure-boosting station and the Snowboard Funpark in Alblitt 

2008/2009

Nighttime tobogganing  from 7:00 pm to 9:00 pm; expansion of the children’s area towards the nearby reservoir with 2 new magic carpets and a children’s slope; construction of the “Flaxiabfahrt” run; expansion of parking facilities; expansion of the snow-making system; membership of the “Freizeitticket Tirol ”

2009

Construction of the Alpine herb and stone garden, the themed Dias circular hiking trail and the petting zoo 

2009/2010

2009/2010    Replacement of “Hirschenbad” practice lift with a new 200-metre covered conveyor belt; membership of “Tirol Snow Card ”; expansion of Sunny Mountain Restaurant with 200 additional seats; construction of a professional funpark in the Alblitt area; expansion of the snow-making facilities at the race track  and the funpark

Summer 2010

Construction of Flaxi-Dorf at Silbersee

2010/11

Implementation of the new information channel with 3 broadcasters; free wifi in all Sunny Mountain restaurants; implementation of the panoramic camera at Alblittkopf; award for excellent slope quality 

2011/12

Construction of the permanent Zibob®track  with Austria’s longest, covered conveyor belt; implementation of the panoramic camera at 
Alblitt; construction of the ski bus terminal at the valley station of Diasbahn cable car; construction of a new conveyor belt at Sunny Mountain Adventure Park

Summer 2013

Renovation of “Alte Diasalpe” and opening of Almmuseum; slope improvements at the valley run; implementation of a summer panoramic camera at the Adventure Park; establishment of the summer card “Silvretta Card all inclusive” 

Winter 2013/14

Construction of the Freeride  Checkpoint; 3 new ski routes

Summer 2014

Expansion of the kiosk at the Adventure Park, new sun terrace at the kiosk

Winter 2014/15

Snow-making and slope improvements at Lattenabfahrt  run; purchase of new snow cannons 

Summer 2015

Expansion of the Adventure Park with a low-rope course

Winter 2015/16

Implementation of snow-making facilities at the toboggan run; purchase of a new snow-grooming machine

Summer 2016

Expansion of the summer restaurants at the Adventure Park; expansion of the Adventure Park itself; construction of the disc golf course

Winter 2016/17

Expansion of the Flaxi Run in the Adventure Park.
 Expansion of the kiosk snack stand to include a covered area.
Completion of snowmaking for the toboggan run, including depot snowmaking, as well as the installation of new snow generators.
Renovation of the slide house with direct feeding of the valley line without pre-pumping.
Clearing work for Project Slope 5, including terrain correction, renewal of snowmaking, and preparation of water supply for the Alblitt snowmaking system.
Construction of the new Flaxi run at the slide house.

Summer 2017 Installation of a new elevated water tank for the drinking water supply.
Renovation and expansion of the restaurant sink, as well as the relocation of the restaurant management office.
Winter 2017/18 Slope 5 and Alblitt run have been graded, with comprehensive terrain corrections carried out, including the connection of Ski Path 5 to Slope 5.
Renewal of the snowmaking system and transition to a lance system.
Installation of preparation and transport lines for snowmaking in the Alblitt area.
2018 Construction of the Dias II storage pond.
Slope improvements between the piste equipment garage and Tajaeck.
Expansion of parking areas and installation of an additional diesel tank.
Start of the toboggan run project (lowest section).

Summer

2020

Completion of the Dias II storage pond.
Further expansion and improvement measures in the Sunny Mountain area.
Summer 2021 Expansion of the parking lot opposite the valley station, adding approximately 50 new spaces.
Widening of the valley descent slope in the area of the sheep barn (a sub-project also for the toboggan run up to the valley station).
Project for reforestation to replace the area for the new storage pond above Kuhlochweg.
Construction of the Flow Trail Dias Kappl.
2022 Extension of the toboggan run to the valley station (from the Höferbachli area to the Tschatscha underpass), including snowmaking, fencing, and lighting.
Further expansion of the parking lot in conjunction with the construction of the toboggan run.
Completion of the Flow Trail Dias Kappl.
Renovation of the Mardinalift (continuously adjustable drive, camera surveillance).
Completion of the reforestation project above Kuhlochweg.

Summer

2023

Replacement of 10 snowmaking lances in the lower section of the valley descent.
Winter 2023/24 Start of the Kappl & See ski lift connection (ticket alliance).

Summer

2024

Preparatory work and approval procedures for the construction of the Diasbahn (Dias lift).
Optimizations to the snowmaking system (including adjustments to the locations of the lances).
Construction of a restroom facility near the fish pond.
Extensive cable car inspections (including the Mardinalift and DSB Gongall).
Winter 2024/25  Viewing gondolas of the new lift at the valley station and Kappl village.
Two new winter hiking trails: Müllermahdlen and Seßlad.

2025

New construction of the Diasbahn

Winter

2025/26

 Introduction of the new mascot "Sunny."
Creation of slopes 13 "Sunny Waveline" and 14 "Sunny Funline" with Sunkid animations.
Mountain meadows winter hiking trail.

Summer

2026

New Sunny Mountain Cart track, Alblittbahn now in operation.
Take part and win!

Take part in our survey and win a day ski pass!